Jackson, MS
Clear Sky
High 46° Low 39°
Jackson, MS Clear Sky
46°/39°
Select Page
Traveling through JAN? Your safety is our priority. If you 'See Something, Say Something.'   Know Before You Go. Check Your Flight Status Here or with Your Respective Airline.


  • Version
  • 485 Download
  • 163.97 KB File Size
  • 5 File Count
  • 03/15/2021 Create Date
  • 05/10/2021 Last Updated
  • Download

Project Title: Taxiway Bravo Rehabilitation Project
Project Type: Request For Qualifications (RFQ)
Project Location: Hawkins Field Airport
Pre-Submission Conference: Wednesday, March 31, 2021 at 10:00 a.m. Central Standard Time (CST) on (the “Deadline”).
Submission Deadline: Wednesday, April 21, 2021 at 4:00 p.m. Central Standard Time (CST) on (the “Deadline”).

Addendum No. 1 is available.
Addendum No. 2 is available.
Addendum No. 3 is available.


FileAction
Advertisement - RFQ Taxiway Bravo HKS 3.8.21 final.pdfDownload 
Taxiway Bravo Rehabilitation Project 3.31.2021.pdfDownload 
Addendum No. 1 - HKS Taxiway Bravo Rehab[85].pdfDownload 
Addendum No 2 - HKS Taxiway Bravo Rehab.pdfDownload 
Addendum No 3 - HKS Taxiway Bravo Rehab.pdfDownload