Jackson, MS
Scattered Clouds
High 79° Low 75°
Jackson, MS Scattered Clouds
79°/75°
Select Page
Traveling through JAN? Your safety is our priority. If you 'See Something, Say Something.'   Know Before You Go. Check Your Flight Status Here or with Your Respective Airline.


  • Version
  • 800 Download
  • 2.16 MB File Size
  • 3 File Count
  • 02/01/2023 Create Date
  • 11/07/2023 Last Updated
  • Download

Project Title: New Air Traffic Control Tower Feasibility Study at JAN
Project Type: Request for Statement of Qualification (RFQ)
Project Location: Jackson-Medgar Wiley Evers International Airport

Submission Deadline: Monday, March 13, 2023, 4:00 p.m. Central Standard Time (CST) on (the "Deadline”)

Addendum #1 is Available.


FileAction
New Air Traffic Control Tower Feasibilit Study at JAN Addendum No. 1.pdfDownload 
RFQ - New Air Traffic Control Tower Feasibility Study at JAN.pdfDownload 
RFQ - New Air Traffic Control Tower Feasibility Study at JAN Agreement(i).pdfDownload