Jackson, MS
Clear Sky
High 74° Low 69°
Jackson, MS Clear Sky
74°/69°
Select Page


  • Version
  • 53 Download
  • 7.02 MB File Size
  • 4 File Count
  • 08/25/2021 Create Date
  • 09/20/2021 Last Updated
  • Download

Project Title: Passenger Boarding Bridge Replacement at Aircraft Gate 2
Project Type: Request for Bids (RFB)
Project Location: Jackson-Medgar Wiley Evers International Airport
Pre-Bid Video Conference: Wednesday, September 8, 2021, at 10:00 a.m. Central Standard Time (CST)

Deadline for Questions: Extended to Wednesday, September 15, 2021, at 4:00 p.m.

Submission Deadline: Extended to Friday, September 24, 2021, at 4:00 p.m. Central Standard Time (CST) on (the “Deadline”).

Addendum #1 is Available


FileAction
Final - RFB - Passenger Boarding Bridge Replacement at Aircraft Gate 2 - 8.23.21.pdfDownload 
JMAA Passenger Boarding Bridge 2 Drawings.pdfDownload 
Addendum 1 RFB - Passenger Boarding Bridge Replacement at Aircraft Gate 2.pdfDownload 
Addendum 2 RFB - Passenger Boarding Bridge Replacement at Aircraft Gate 2.pdfDownload